image image image
USAK MIXED ORGANIZED INDUSTRIAL ZONE WASTEWATER TREATMENT PLANT
ALTINOLUK MUNICIPALITY WASTEWATER TREATMENT PLANT
MERSIN TARSUS ORGANIZED INDUSTRIAL ZONE WASTEWATER TREATMENT PLANT
1 2 3

     ENTA Engineering is specialized on the subjects of Water Treatment, Industrial and Domestic Wastewater Treatment, Package Water and Wastewater Treatment Units and the manufacturing of the Wastewater Treatment equipments and has built up more than 400 plants at Turkey and 11 countries in the world. Enta gives services about the scopes of  project design, manufacturing, installation, management and commissioning of the systems.

    Beginning from the design and engineering stages, all services of ENTA has been supported by its experienced, improver and modernist engineer/technician staff.

    As being Enta, we will continue to be your partner at the local and international projects in order to provide permanent and  innovative solutions and better services.

 


 

İNSA
Yapı
   OOO KASA
Stroy
   GEOBOS
Zemin Güçlendirme
                                                                                              

                           

News From Enta

In order to increase the quality and register the quality of its service, in addition to the Certificate of ISO 9001:2008 Quality Management, ENTA has got the Certificate of ISO 14001:2004 Environmental Management System and the certificate of OHSAS 18001:2007 Occupational Health and Safety Management System. Also ENTA has got the CE Certificate about the manufacturing of water and wastewater equipments, package treatment plants and sludge drying equipments.
The final acceptance of the Domestic and Industrial Wastewater Treatment Plant with the capacity of 3.000 m3/day which is established at Mersin Tarsus Organized Industrial Zone by ENTA.
The installation and commissioning works of the Water Treatment Plant of Renault A.Ş. Moscow Factory have been completed. Also the installation works of the Wastewater Treatment Plant of Renault-Moscow factory has been completed and the commissioning of the plant is continuing.
The contract of Amasya Municipality Solid Waste Management Project, Leachate Treatment Plant has been signed with the main contractor Maksomer A.Ş. The installation works of the system is completed and its commissioning works will be done.
The tender about the wastewater treatment plant with the capacity of 4.000 m3/day of the Ethiopia factory of Ayka Textile, has been won. The construction of the plant is continuing and the installation and commissioning of the plant will be completed at the first half of the year 2010.
The wastewater treatment plant of Bahariye Mensucat San. ve Tic. A.Ş. at Corlu has been completed. The plant will enter into service inside the year of 2010.
ENTA Engineering has taken place as a participant at the exhibition Project Qatar 2009 6. International Construction Technologies and Materials.
Enta that has won the tender of Oludeniz (Belcegiz) / Fethiye Municipality Wastewater Treatment Plant Revision, has performed the handing over of the plant by completing the revision works.
ENTA has won the tender of project design of Malatya 2. Organized Industrial Zone Wastewater Treatment Plant and continues its project workings.
ENTA has taken place as a participant at the exhibition ASHGABAT EXPOBUILD 2010 dated on 27-29 January 2010 at Turkmenistan
Enta has taken place as a participant at the exhibition LIBYA BUILD 2010 dated on 16-20 May 2010 at Tripoli / Libya.
ENTA will take place as a participant at the exhibition BAKU EXPOBUILD 2010 dated on 17-20 June 2010 at Azerbaijan.